The Klondike Mines Railway


Klondike Mines Railway engine # 1


The first run out of Klondike City with engine #1 in the lead.  The first 13 miles of track was completed in mid-July 1906--the run from Dawson City, the official terminal, to Grand Forks. The remaining mileage to Sulphur Springs was completed by October to a distance of 31 miles at a final cost of about two million dollars.


KMR #1, a Brooks 2-6-0, was built in 1881 as Kansas Central Railway No. 7.  It went through several changes in ownership, including the Canadian Pacific, one of my own mainline railroads on the Phase II segment, before being sold to the White Pass & Yukon as No. 63.  In 1902 it was sold to the KMR.  As of 1961 it went to the City of Dawson as a static display.


All pictures are clickable to a larger size


Continue
Main Page KMR intro related links railroad links Cicely Project
Kennecott Mines CRNW Railway Copper Rail Depot Kennecott models Legacy of the Chief